Saryu Roy lays foundation for schemes worth over Rs 21 crore in Jamshedpur East

MLA inaugurates projects under MLA Fund, Urban Development, and Road Construction Departments

Jamshedpur East MLA Saryu Roy laid the foundation stone and inaugurated various schemes costing more than Rs 21 crore on Saturday, including projects under the MLA Fund, Urban Development Department, and Road Construction Department. The foundation stone laying ceremony took place at Son Mandap in Sidhgora for 44 schemes worth Rs 5.08 crore in the Eastern Assembly constituency.

JAMSHEDPUR – Roy visited the site and laid the foundation stone of two schemes costing Rs 15 crore 91 lakh, approved by the Road Construction Department, which includes the construction of many big and wide roads in Baridih, Birsanagar, Bhuiyandih, Gemco Manifeet. The MLA emphasized that the construction of the schemes should be of quality and completed on time for dedication to the citizens.

Apart from these schemes worth Rs 21 crore, Roy also started the work of installing 400 solar lights from Kalyannagar in Bhuyandih and inaugurated the installation of a new 200 KW transformer in Arjun Colony, Moharda, and the installation of paver blocks around Shiv Mandir in HUDCO Colony, Telco. All these inauguration and foundation stone laying programs took place between 9 a.m. and 2:30 p.m.

Preparing for Lok Sabha elections

Roy mentioned that the Model Code of Conduct will come into force as soon as the notification for Lok Sabha elections is issued, prohibiting the implementation of new schemes during this period. He instructed that the remaining schemes should be surveyed and estimates prepared for quick implementation after the code of conduct ends in May.

Focusing on small schemes

The MLA asked workers to prepare details of small schemes in their areas for the Lok Sabha elections, identifying the need for roads, drains, community buildings, etc., to ensure their completion within four months after the elections.

"Whatever schemes are left, those schemes should be surveyed and the estimates should be prepared so that as soon as the code of conduct ends after May, they can be implemented quickly," Roy stated.

On the occasion of foundation stone laying, mainly MP representative Sanjeev Kumar, Deputy Municipal Commissioner of JNAC Krishna Kumar, MLA Public Facilities representative Hareram Singh, Secretary Sudhir Singh, MP representative Eastern Assembly Chandrashekhar Mishra, P Vijay Kumar, Manoj Singh Ujjain, Chandrasekhar Rao Jamshedpur. Axis Assistant Engineer Prabhakar Kumar, Junior Engineer Nitesh Kumar, Vijay Narayan Singh, Raghavendra Pratap, Vinod Yadav, Golden Pandey along with BJM workers and residents of the area were present.

The foundation stone laying includes the following schemes:

Schemes of road construction department

1. (a) Baridih Basti Meera Path Subhash Path, Toopi Path, Naga Baba Mandir Path, Bagun Nagar-Bagunhatu Pulia Path, Dinkar Path, Vidyapati Nagar, Gandhi Path, Mahabir Path, Gautam Path, Bari Path, Mandir Path, (Length 6.25 )

(b) Gemco Basti Mishra Bagan Road No. 1, 2, 3, 4 Road, Laxminagar Main Road to Football Ground-Bajrangi Bagan-Hanuman Mandir Road (up to Main Road), Manifit Lakdi Tall Sukhi Colony to Manifit Company Main Road, Azad Basti Shiv Mandir to Belgadha Main Road (Length 4.4 kilometer) and

(c) Construction of road (1.5 km) from Golmuri Vidyapatinagar to Akashdeep Plaza via Agrico boundary wall.

2. Tata Timken Main Road to Babudih Basti Road, Bhuiyandih Park to Main Road (Kali Mandir), Bhuiyandih Nirmalnagar Road and Cross Road, Babudih Main Road to Jharna Ghat Road and

(b) Birsanagar, Thana Main Road (Ganesh Sweets) to Ice Cream Factory Sidhu Kanhu Main Road and Link Road, Ganesh Sweets to Birsanagar, Zone No. 8 Hari Mandir, Sarna Puja Sthal and Link Road, Kali Mandir to Zone No. Construction of culvert and road till 6.

Schemes of Urban Development and Housing Department

1. Construction of road from Bakunth Dwar to Subhash Ashram in Baradwari, Devnagar.

2. Construction of road from Baridih Basti, Dinkar Path, Sahu ji’s house to Anil Giri’s house.

3. Construction of various roads in Burmamines, Tube Harijan Basti and installation of pavers blocks in Durga Puja ground.

4. Construction of various roads in Barmaines Indersingh Basti.

5. Construction of guardwall on the roadside from near Burmamines, Eastplant Basti, Sunsunia Gate to near the Banyan tree.

6. Pavers block installation in Vinova Ashram, Jai Prakash Ashram, Seva Ashram and Ram Ashram.

7. Construction of dRoyn in Birsanagar, Zone No.-4.

8. Construction of RCC dRoyn at various places in Bagunnagar, Adarshnagar, Baridih Basti.

9. Renovation and beautification work of community building in Hari Maidan, Baridih.

10. Renovation and beautification work of community building in Lohra Basti, Vidyapatinagar, Baridih.

11. Birsanagar, Zone No. Construction of dRoyn in Birsa Path in 10.

12. DRoyn construction in Vivekananda Road, Bagunagar, Baridih, Jamshedpur.

13. Construction of community-cum-public toilet in Christian Colony near Baridih, Bhojpur Colony.

14. Birsanagar, Zone No. Upgradation and fencing work of the boundary wall of the ground of Sanchu Koya Sports Complex located at 6 and construction of a dRoyn with iron mesh on the edge of the ground to dRoyn water from the ground complex.

15. Construction of various dRoyns in Burmamines Carriage Colony.

16. Construction of boundary wall of Manifeet, Rajak Samaj, Dhobi Ghat.

17. Construction of Karam Kand Sthal in Golmuri, Kailash Nagar.

18. Birsanagar Zone No. 6B, Kalu Bagan Road from Amarjeet Singh’s house to Anita Devi’s house and construction of guardwall from Suchitra Devi’s house to Anita Devi’s house.

19. Construction of three rooms near Telegraph Company Gurudwara.

20. Installation work of 5th high mast light (12 meters) under Jamshedpur East Assembly constituency.

21. Installation work of 4th high mast light (16 meters) under Jamshedpur East assembly constituency.

22. Installation work of 3rd high mast light (20 meters) under Jamshedpur East Assembly constituency.

23. Installation work of 6 numbers of deep boring under Jamshedpur East Assembly Constituency.

24. Sidhgora

Installation work of air conditioner, fan and other materials in Sonmandap and Yatri Niwas Bhawan complex.

MLA fund schemes

1. Birsanagar, Zone No. Construction of road from the residence of Mewalal Rajak to the residence of Ravi Singh Chandel behind Canara Bank in 11.

2. Construction of road from Rajiv Verma’s house to Sanjay Verma’s house in Moharda, Deepa Colony, Om Path.

3. Moharda Vijaya Garden, Gate No. Construction of road in Mansa Path, near No. 2.

4. Construction of dRoyn from MP Srivastava’s house to Chandramani’s house near Lakshmi Gas warehouse in Baridih Basti.

5. Pavers block installation work near Durga Shiv Temple, behind Hume Pipe, Nirmal Bhawan.

6. Construction of boundary wall of Zahira site situated in Laxmi Nagar, Jhagru Bagan.

7. Moneyfeet, Punjabi Line, Road No. 5 from Harbhajan Kaur’s house via Kashmir Singh’s house on line no. Till the last of 6 and road no. Construction of road from Deendayal Singh’s house to Sohan Singh’s house in 4.

8. Birsanagar, Zone No. 4 Paving work of Shivam Path.

9. Golmuri, Namda Basti, Anand Nagar, ‘A’ Block, Road No. In 5, construction of slab on the dRoyn from Vinay Yadav’s house to Omprakash Singh’s house and construction of culvert near Sunil Singh’s house.

10. Bagunnagar, D Block, Cross Road No. Construction of road and dRoyn from Jai Prakash Bhagat’s house to Niranjan Sahu’s house in 2nd.

11. Birsanagar Zone No. 3, C Block, Road construction from SP Sen’s house to Mangal Das’ house behind Hari Mandir.

12. Birsanagar, Zone No. Repair of slab and dRoyn over open dRoyn in 1 ‘B’, Road No. 11.

13. Moharda Arjun Colony, Road No. Repair work of 1.

14. Construction of road and dRoyn from Birendra Upadhyay’s house to Tiwari ji’s house behind Bagunnagar, ‘B’ Block, B Road, TOP.

15. Construction of dRoyn from Bhim Chaube’s house to the main road in Baridih Basti, Shanti Nagar.

16. Construction of dRoyn from Vinod Gop’s house to Rajesh GagRoy’s house in Bagunhatu, Block ‘A’.

17. Construction of boundary wall near Radhakrishna Temple in Bhuiyandih.

18. Repair work of guardwall on dRoyn in Dhobi Ghat, Bhuiyandih Patel Nagar.

19. Beautification of Durga Mandap of Public Durga Puja Committee located near Agrico Traffic Signal and installation of pavers blocks nearby.

Join Our Newsletter

Feel like reacting? Express your views here!

Related News

साकची में सब्जी विक्रेता पर चापड़ से हमला

जमशेदपुर के साकची में सब्जी विक्रेता पर चापड़ से हमला हुआ, पुरानी रंजिश बताई जा रही है, पुलिस ने मामला दर्ज कर आरोपी की तलाश शुरू की है।

Man Attacked With Chopper in Sakchi Over Old Dispute

A vegetable vendor was attacked with a chopper in Sakchi, Jamshedpur, over an old dispute, prompting police action and a search operation for the accused.

Opinion

Middle East War Risks Global Economic Shock

Rising Middle East tensions could trigger a global food and fuel crisis, highlighting weak global governance and costly geopolitical adventurism.

Baby Girl

Congrats, it's a baby girl.  Wrap her up, let the autumn leaves curl. At 5, she plays with her brother's car. Her mother reminds, come back soon...

Just A Girl 

You May Also Like

चाकुलिया में युवती ने पेड़ से फांसी लगाकर दी जान

चाकुलिया के मुराठाकुरा गांव में 21 वर्षीय युवती ने पेड़ से फांसी लगाकर आत्महत्या की, पुलिस ने मामला दर्ज कर जांच शुरू कर दी है।

Young Woman Found Dead by Hanging in Chakulia Village

A 21-year-old woman died by suicide in Chakulia village, prompting police investigation as authorities probe the cause behind the tragic incident.

Read More

Discussion

Recent