Jugsalai Railway Under Bridge Construction Commences
DRM Arun J Rathore’s Assurance Leads to Under Bridge Development
Concrete Road Construction Begins at Jugsalai Railway Under Bridge
JAMSHEDPUR – Following assurances from Divisional Railway Manager Arun J Rathore, the construction of a 1-foot thick concrete road at Jugsalai Railway Under Bridge has officially begun.
This development comes after a meeting held on November 8th with a delegation led by CGPC Chairman Sardar Shailendra Singh at the Chakradharpur office.
The concrete road’s thickness has been intentionally kept over one foot to prevent water accumulation.
On this significant day, Sardar Shailendra Singh, Chairman of the Civil Struggle Committee, along with others, inspected the ongoing work at the Railway Under Bridge.
The delegation, including contractor Rana Singh, provided detailed information about the construction progress.
Sardar Shailendra Singh expressed satisfaction with the work being carried out by the contractor.
In a statement of gratitude, Singh acknowledged DRM Arun J Rathore’s role in this project.
He also conveyed his optimism for the future, hoping for the expansion of Station Road to a double width.
Singh affirmed that efforts and advocacy for this expansion will continue.

